Our Work in Action
New asphalt footway adjacent to residential properties during final compaction and finishing works.
Prepared carriageway showing sub-base and alignment ready for final surfacing within the development.
Completed footpath with smooth asphalt finish and clean kerb lines following the road layout.
Footway in final finishing stage with operatives ensuring consistent surface quality and compaction.
Newly surfaced roadway demonstrating texture, compaction, and readiness for use.
Completed footpath section integrated with surrounding landscaping and defined kerbing.
Curved pedestrian pathway with uniform asphalt finish and clean transitions.
Extended footway alongside residential units showing continuity and alignment with street infrastructure.
Wide-angle view of completed footpaths and carriageway within the housing development.
Junction area with newly formed footpaths and kerbing prepared for final landscaping.
Completed footway with tactile paving and dropped kerb providing safe and accessible crossing points.
Newly surfaced carriageway alongside residential properties showing consistent finish and alignment.
Completed roadway section with defined parking bays and clean surface finish.
Footpath and access route nearing completion with kerbing and surface preparation in place.
Curved roadway with fresh asphalt surfacing integrated into the wider development layout.
Finished carriageway adjacent to housing blocks demonstrating uniform surface quality and detailing.
Wide view of completed road and footway highlighting overall layout and infrastructure integration.
Completed roadway and footpath with consistent surfacing and alignment through the residential development.
Groundworks and external works delivered for multi-storey housing scheme.
Kerbing, sub-base and access route installation.
Excavation and site preparation using in-house plant.
Internal access and paving within residential development
Paving and external finishing to main building entrance.
Concrete works progressing well on site, with newly formed yard bays taking shape.
Precision kerbing installed alongside the newly laid concrete surfaces, creating clean edges and structured bay divisions across the site.
The team made excellent progress completing the concrete works, achieving a smooth and consistent finish across the yard area.
Final checks carried out by the team to ensure the concrete finish meets Paton Construction's high standards of quality and durability.
Paton Construction expands its fleet with the addition of a new MAN van, received by David Stewart from David Malcolm, Sales Executive at MAN.
Installation of stormwater chambers
Sustainable drainage systems
Water main laying works
Industrial floor base works
Damp-proof membrane laying
Steel column base installation
Site preparation works
Block paving groundworks
Professional CAT scanning
Health & Safety Excellence
Professional project delivery
Road construction expertise
Contact us to discuss your project requirements